From first look to switched on
The eight steps
Get an estimate
Use our Designer. Find your house on the map, lay the panels out on your roof, pick a battery and tell us roughly what you use. You get a price range and an estimated saving straight away, with no sales call.
Full written quote
Our design partner Oval Renewables prepares a written quote with an MCS performance estimate and every assumption written down. They may call or email to check a few details.
Technical survey
We come out, measure up, and check the roof, the fuse board and the loft. There is a £200 survey deposit, which is refundable.
Final price and contract
We confirm the price. You sign the MCS contract pack and pay a 25% deposit. That secures your installation date, and we book the scaffolding and order your equipment.
Before the install
A 35% stage payment is due once your equipment is ordered and your date is within three weeks. If your system needs approval from the grid operator, we will have that in hand by now.
Installation
Scaffold up, panels on, inverter and battery wired in, everything tested.
Handover
We show you how everything works, set up the app on your phone and answer your questions. The remaining 40% balance is due once you have seen it all running.
After-care
A follow-up check to make sure everything is performing as it should, plus your first-year inspection, which is included.
How you pay
Nothing is due until you have seen a written quote.
£200 survey deposit
Books your technical survey. Refundable.
25% on signing
Secures your date. We book scaffolding and order your kit.
35% before install
Once your equipment is ordered and the install is within three weeks.
40% on handover
Only when the job is finished and we have shown you the system working.
The grid paperwork, handled for you
Every system has to be registered with your local grid operator. Smaller systems can be connected first and notified afterwards, so there is no waiting. Larger systems need approval before we install. We make the application for you as soon as you have confirmed the size, and we tell you up front if yours is one that needs it, because it can add several weeks.
What is not included
We would rather tell you now than surprise you later. These are priced separately, and only if they are needed:
- Repairs to roof defects that were already there
- Fixing existing electrical faults, or bringing an old fuse board up to standard
- Panels on a separate building such as a garage, annexe or outbuilding
- Planning permission for listed buildings or conservation areas
- Grid operator design fees or grid reinforcement work, if the grid operator asks for them
- Non-standard scaffolding, for example over a conservatory, on three storeys or with restricted access
Common questions
Is the survey deposit really refundable?
Yes. It books your technical survey, and it is refundable.
Who will I be dealing with?
East Renewables fits your system and looks after you locally. Our design partner Oval Renewables prepares the written quote and the MCS performance estimate.
How long from saying yes to switched on?
Installation is usually within 3 to 4 weeks of signing, and the install itself typically takes 2 to 3 days. Larger systems that need grid approval can take longer.
More questions?
Have a look at our frequently asked questions, or give us a ring.
Ready for step one?
It takes about five minutes and you do not need to speak to anyone.

